Role of DAPCUs in establishing F-ICTCs:
In Purba Medinipur District, DAPCU supports
the
district
authority as well as unit authority to carry out the
SWOT analysis before launching the programme in a unit. Through this analysis
authority of respective units realize the infrastructural strength, client load
at OPD & Pathology unit, workload of respective staffs and benefits of
community people as well as medical staffs. DAPCU also follows, informs &
coordinates with FICTCs & WBSAP&CS regarding the geographical gaps, migration
pattern, occupational trends, vulnerability issue and the need aroused from
Spatial Map analysis. Moreover, DAPCU play a proactive role to comply with the
administrative order of WBSAP&CS regarding the opening of FICTC.
DAPCU provides supportive
supervision to FICTCs in each month by utilizing the monitoring format of ICTC provided
by NACO. During on-site visit DAPCU religiously verify stock position, referral
linkage and documentation. DAPCU also organizes monthly review meetings at
district level where analysis are done on achievements, gaps and problems faced
etc.
Facility Integrated Counselling & Testing Centre
for HIV screening is relatively new concept introduced in NACP-III by NACO
under intradepartmental convergence strategy. The
basic idea of establishing FICTC is to cover more people of a district by
utilizing existing human resource & infrastructure of health
department. The Counsellor of Anwesha (Adolescent) clinic and LT of DMCs are
being trained and deployed to perform screening of HIV at BPHC/CHCs/PHCs. To
these counsellors and LTs this HIV test seems to be an additional task to
perform, and hence they resist. Here comes the role of DAPCU to explain the importance of
the test and motivate the team and the authority of the respective institutions
to incorporate the service along with other running programmes.
DACO delivering speech in a sensitization programme |
Capacity building of FICTC
- In West Bengal WBSAP&CS organizes training programmes for Counsellors
(Anwesha Clinic) & LTs as per their plan, DAPCU supports them by providing
release order from the end of CMOH to concern FICTCs.
District level orientation session on FICTC - DAPCU organizes sensitization programmes on HIV/AIDS, orientation on NACP deliverables, status & information of other NACP facilities of the district, ART information, orientation on PEP etc for MO, ANMs, Indoor staffs, Supervisors, ASHA and all other working staffs of BPHCs (Block Primary Health Centre).
- DAPCU also organizes on-spot orientation of LTs by involving MT Labs of Standalone ICTCs.
- Moreover, DAPCU provides orientation & handholding support in documentation and reporting.
- DAPCU also guides the team regarding the linkage of FICTC with other NACP facilities.
- DAPCU also arrange to provide logistic support like centrifuge machine, micro-pipette, HIV testing kit, syringe, needle, scheduled registers, consent forms, reporting pad etc.
Strengthening of linkages between F-ICTC and
ICTCs
As per the standard testing
protocol all clients screened as HIV reactive at FICTC are to be referred to
the nearest ICTC for conducting confirmatory test. So, FICTCs are informed
about the contact details of all ICTCs of the districts, even at the initial
stage DAPCU plays a vital role to link clients of FICTC to ICTC. In due course
FICTCs are linked with DLN, TI NGOs & LWS for better linkage.
Monitoring and evaluation of F-ICTCs
DPM is trying to resolve conflict of Erashal FICTC |
Few achievements
Currently there are seven numbers of
FICTC are functional (03 in 2011-12 and 04 in 2013-14) along with 10 ICTCs and
notably some FICTCs are performing equally like an ICTC. Till date FICTCs have
catered 5311 clients in the districts. A comparative achievement is presented hereunder.
Though the time frame is different and in between a good numbers of
sensitization and IEC programmes were conducted in the district by DAPCU. The
figure shows that the concept of FICTC is an effective strategy to cover more
numbers of people of a district. If close monitoring not ensured the public
interest may be hampered and also mishandling of kit and other logistics may
occur.
New ICTCs
|
FICTCs
|
||||||
Month wise Performance
starting from inception
|
Reapara
|
Mugberia
|
Paikpari
|
|
Khejurberia
|
Bhagwanpur
|
Moyna
|
July'10
|
March'10
|
June'10
|
August'11
|
August' 11
|
January'12
|
||
Testing
|
Testing
|
||||||
1st
|
35
|
11
|
27
|
39
|
24
|
21
|
|
2nd
|
38
|
24
|
85
|
66
|
98
|
257
|
|
3rd
|
69
|
72
|
71
|
58
|
55
|
238
|
|
4th
|
32
|
63
|
46
|
116
|
0
|
107
|
|
5th
|
52
|
84
|
59
|
154
|
0
|
137
|
|
6th
|
32
|
66
|
74
|
103
|
0
|
122
|
|
Total
|
258
|
320
|
362
|
536
|
177
|
882
|
No comments:
Post a Comment